★★★★★ 5.0 from 127 Google reviews · Licensed & insured · Serving coastal NC for 20+ years
Text us  ·  (910) 799-3858
ATLANTIC ROOFINGCOMPANY · WILMINGTON NC
Home / Residential / New Construction / New construction roofing
New construction roofing

New construction roofing, from plans to final

Takeoffs and a written bid from your plans, a fast dry-in after sheathing, clean job sites and one contact from dry-in to final.

★ 5.0 · 127 Google reviewsBids from plansFORTIFIED-ready
Free · No obligation

Get a new construction roofing bid

Tell us what you need and we will call or text to schedule.

No spam. We never sell or share your information. Privacy · Terms

Thanks, we got it.

We'll reach out shortly. Need us now? Call (910) 799-3858.

🛡FORTIFIED Roof Certified
CertainTeed ShingleMaster Premier CredentialedCertainTeed ShingleMaster Premier
🏢GAF Commercial Certified
🏛2024 Historic Wilmington Preservation Award
💳$0 down, 0% for 12 months*
Instant price

What would a new roof cost on your home?

Type your address. We measure your roof from satellite and show your price range for shingle, metal and FORTIFIED, right on the page.

Prefer to talk? Call (910) 799-3858.

New construction roofing from Atlantic Roofing covers the whole roof scope on a new home: a takeoff and written bid from your plans, underlayment installed quickly after sheathing to protect the framing, shingle, metal shingle or standing seam metal installed to the North Carolina Residential Code and manufacturer specs, and FORTIFIED construction when you want it. Call (910) 799-3858.
What you get

New construction roofing, start to finish

Takeoff and bid

We measure from your plans and return a written bid with materials, schedule and warranty.

Fast dry-in

Underlayment goes on quickly after sheathing so windows, siding and interiors are not held up.

Install and inspection

Installed to the NC Residential Code and the manufacturer specs, so inspections pass the first time.

Final and warranty

Punch-list items handled by a local crew, warranties registered in the homeowner's name.

Why the roof matters so much on new construction

On a new home, the roof is one of the trades that most affects the schedule. A late dry-in holds up windows, siding, mechanicals and drywall, and a sloppy roof turns into warranty callbacks a year after closing. Good new construction roofing is about timing and details as much as shingles or panels: underlayment on fast, clean edges and valleys, every wall and penetration flashed right, and a site the next trade can walk onto.

Atlantic Roofing works with production builders, custom builders and owners building their own home around Wilmington and the beaches. We confirm start dates with your superintendent, keep the site clean and nails swept, and take photos at key stages for your file.

Choosing a roof system for a new home

The right system depends on the home, the lot and the buyer. Here is how builders around Wilmington usually decide:

SystemWhy builders choose it
Architectural shinglesLowest cost, fast install, wide color range, fits most HOAs
Standing seam metalPremium coastal look, long life, strong buyer appeal on waterfront lots
Metal accentsStanding seam over porches and bays with shingles on the main roof, a coastal look at moderate cost
Metal shinglesMetal durability with a traditional appearance

Standing seam needs more lead time because panels are made to length for the house. Shingles can usually start within a few weeks of notice.

Building FORTIFIED from day one

The cheapest time to build a FORTIFIED roof is during construction. Sealing the deck seams, using ring-shank nails at the required spacing and installing upgraded edge details adds relatively little cost while the framing is open, and a FORTIFIED designation is a selling point for coastal buyers. Higher levels, FORTIFIED Silver and Gold, address openings and a continuous load path and are easiest in new construction. We coordinate with the FORTIFIED evaluator so every required step is documented with photos.

Ventilation and attic design on new homes

Many early roof failures in the Southeast start in the attic, not on the roof. Without balanced intake at the soffits and exhaust at the ridge, attics trap heat and moisture that cook shingles from below and can void manufacturer warranties. On new construction roofing we confirm the ventilation plan before install: enough net free area at the soffits, a continuous ridge vent where the design allows, and bath and kitchen fans ducted all the way outside. For sealed, conditioned attics with spray foam, we follow the shingle manufacturer's requirements for that assembly.

Scheduling new construction roofing

A few weeks of notice is enough for most shingle roofs. Standing seam metal needs extra time because panels are manufactured to length. Tell us your framing and sheathing dates and we will hold a dry-in date, then confirm it with your superintendent the week before. If the schedule moves, we move with it.

How to request a new construction roofing bid

Send plans or a roof plan, the address, the material and color you want, and your target dry-in date. We return a written bid with materials, schedule and warranty, plus FORTIFIED options if you want them. Call (910) 799-3858 or use the form above.

★★★★★
“They kept us informed every step of the process.”
Jeff and Deb Walker · Google review
Real Atlantic Roofing jobs

New construction roofs we have installed

Every photo is an actual Atlantic Roofing job, shot by our crew.

Galvalume standing seam metal roof on a new home
Standing seam, new build
Architectural shingle roof on new construction
Shingles, new build
Dried-in roof deck before metal panels go on
Dry-in before panels
Black shingle roof on a modern farmhouse
Modern farmhouse

What customers say

★★★★★
“The roof was done much quicker than we thought it would be.”
Christy Carter · Google review
★★★★★
“They are professional, fair and prompt.”
Charlie Hause · Google review
Straight answers

Frequently asked questions

How far ahead should I schedule new construction roofing?

A few weeks of notice is enough for most homes. Standing seam metal needs extra time because panels are made to length.

Do you work from plans?

Yes. Send plans or a roof plan and we return a written takeoff and bid with materials, schedule and warranty.

Can a new home get a FORTIFIED designation?

Yes. Building to the FORTIFIED Roof standard during construction is the simplest and cheapest way to earn it.

Who holds the warranty on a new construction roof?

Manufacturer warranties are registered in the homeowner's name, and our workmanship warranty transfers.

New construction roofing

New construction roofing that keeps the build moving

New construction roofing from Atlantic Roofing means a takeoff from your plans, a fast dry-in, clean job sites, inspection-ready work and one contact from dry-in to final, in shingle, metal shingle or standing seam, FORTIFIED when you want it.

Request a bid Call (910) 799-3858

Roof your next build with us

Send plans and a target dry-in date. Written bid with materials, schedule and warranty.