How to choose roofing for new construction
Start with the buyer and the lot. Production homes in neighborhoods with HOA rules usually go with architectural shingles in an approved color. Custom homes on the water often go standing seam, which suits the coastal look and lasts for decades. Many builders split the difference with standing seam over the front porch and bays and shingles on the main roof. Budget, HOA rules, roof pitch and lead time all matter, and we will price each option so you can compare.
| System | Why builders choose it |
|---|---|
| Architectural shingles | Lowest cost, fast install, wide color range, fits most HOAs |
| Standing seam metal | Premium coastal look, long life, strong buyer appeal on waterfront lots |
| Metal accents | Standing seam over porches and bays with shingles on the main roof, a coastal look at moderate cost |
| Metal shingles | Metal durability with a traditional appearance |
What drives the cost
Prices above are per roofing square (100 square feet) installed, as typical ranges. Your bid depends on roof area, pitch, the number of valleys, hips, dormers and walls to flash, height and access, and the system you choose. Steeper roofs need more staging, and complex roofs need more flashing and labor. A simpler roof plan is the easiest way to keep roofing for new construction on budget.
Lead times by system
Shingle roofs can usually start with a few weeks of notice. Standing seam metal needs extra time because panels are made to length for the house, so give us your sheathing date early. Metal accents follow the same panel lead time. We hold your dry-in date and confirm it with your superintendent the week before.
FORTIFIED adds little during construction
Sealing the deck, using ring-shank nails at the required spacing and installing upgraded edge details cost relatively little while the framing is open, compared to retrofitting later. Any of the systems above can be built to the IBHS FORTIFIED Roof standard, and higher levels, Silver and Gold, are easiest in new construction. We coordinate the evaluator and supply the photos.
Installation details we do not skip
- Underlayment rated for the system and the coast, installed quickly after sheathing.
- Drip edge and starter strips locked down at eaves and rakes.
- Step and counter flashing at every wall, coordinated with the siding trade.
- Balanced ventilation: soffit intake and ridge exhaust.
- Installed to the NC Residential Code and manufacturer specs, so the warranty holds.
Get roofing for new construction priced
Send plans or a roof plan, the address, the material and color you want, and your target dry-in date. We return a written bid with materials, schedule and warranty, plus FORTIFIED options if you want them. Call (910) 799-3858 or use the form above.
“I love my metal roof. I just refinanced, and that roof raised my property value exponentially.”




